Technical consultancy services
2015 | 2017
The project involves the reinforcement of the Aposelemi Dam reservoir from the Lassithi Plateau and includes the underground setting of part of the pipeline with the construction of a 3.5 km long tunnel
2015 | 2017
The project involves the reinforcement of the Aposelemi Dam reservoir from the Lassithi Plateau and includes the underground setting of part of the pipeline with the construction of a 3.5 km long tunnel