Mumbai Metro Line 3 - Contract UG7

Construction of a stretch of the Mumbai Metro Line 3
TBM Design & Supply of main components; Field service

Tunnels betweens the metro stations Seepz, MIDC and Marol Naka

Previous Next

Magmatic rocks consisting essentially of Basalt (1937 m 58.2%) and Volcanic Breccia (1393 m 41.8%)