Construction of the two pipes of the Cityringen circular metro that improves the interconnection of the Vesterbro, Nørrebro, Østerbro and Frederiksberg districts with the historical city centre.
Supply of 2 TBMs (EPB.0578.136-137), back-up, and field service
2011 | 2015
Construction of the two pipes of the Cityringen circular metro that improves the interconnection of the Vesterbro, Nørrebro, Østerbro and Frederiksberg districts with the historical city centre.