Wastewater Conveyor of the city of Riyadh
Technical Assistance
2017 | 2017
Design and construction of 11.903 kilometres of the Waste Water Conveyor of the city of Riyadh, including ten point five (10.5) kilometres of tunnels and four point eight (4.8) kilometres of open trench in place of box culvert.
The project consists in the excavation of two hydraulic tunnels located in Riyadh South, are part of a main sewer of 33.4 km which collects all of municipal wastewater in the city of Riyadh and conveys it to the new treatment plant built in the Al-Haer.
Subcontractor: Pizzarotti Rizzani De Eccher Saudi Arabia Ltd (PRIDE)