Technical assistance for TBM assembly and translation. Supply of specialized personnel for operation & maintenance.
2019 | ONGOING
Check a time-lapse video below with details of the TBM assembly and translation operations.
Excavation of two tunnels by EPB TBMs. Details:
The project consists of a 4 km underground section, of which 2,6 km twin tunnels bored by two 6.6 m diameter Earth Pressure Balanced Tunnel Boring Machines. The Contract includes also 4 underground stations (Kim Ma station, Cat Linh station, Van Mieu station, Hanoi Station), an underground garage, an evacuation shaft and a 300 m length cut and cover section.