Italy
2023 | ONGOING
Since mid-2023, TunnelPro has been involved in the Palermo–Catania project, with particular reference to Lot 4a Caltanissetta Xirbi–Nuova Enna, supporting Ghella in the development of the Technical and Economic Feasibility Design during the tender phase. In 2023, TunnelPro joined the Triscelio Consortium, awarded the contract for the works. For each of the six EPB (Earth Pressure Balance) TBMs, with diameters ranging from 9.32 m to 9.48 m, deployed for the excavation of the Salso, Trinacria and Montestretto tunnels, TunnelPro was responsible for the preliminary construction planning study, site logistics setup during the machine start-up phase, and the analysis of methodological, logistical and organizational optimizations related to mechanized tunnelling operations. Throughout numerous technical meetings with the TBM manufacturers, both during the design and construction phases, the head office engineering department actively contributed to the definition of the technical specifications, ensuring full consistency between the adopted solutions and the functional and operational requirements necessary to execute the works in compliance with project specifications. Since 2024, TunnelPro has also been providing specialist consultancy on the geological aspects of the project and on ground conditioning methods, while supporting the site procurement department in the sourcing of materials and equipment. From 2025 onwards, the engineering department has been engaged in the review of detailed design documents, with particular reference to site layout drawings during the storage phase, the definition of TBM launch procedures, and the preliminary design of the plants and systems required for mechanized excavation.