Supply of TBM (EPB.0372.132), back-up, and excavation supervision
2011 | 2015
Diversion tunnels for 2 run-of-river hydroelectric power plants to be operated in cascade, totalling 85 MW in installed capacity (Pando 33 MW and Monte Lirio 52 MW) on the Chiriquí Viejo River in Western Panamá.