Thessaloniki Metro (Line 1)

Supply of 2 EPB TBMs, design & supply of 2 back-ups and auxiliary jobsite equipment

Two parallel tunnels on a 9.5 km route between the city's New Railway Station and Nea Elvetia, with Pylaia depot further southeast.

Previous Next

Loose sandy-silty or stiff sandy-clayey materials mixed with gravels and boulders and in some areas with ceramics. Recent alluvial deposits composed of low plasticity clay with varying percentages of coarser materials.