Yellow River Diversion Project in Shanxi Province - TBM 3

Supply of TBM (DSU.0411.150), back-up, field service & technical assistance

Construction of the East Trunk Line stretch (main stretch) for the water supply system in the southern part of the Shanxi Province. The peculiar feature of this project is the large presence of water, which called for a special study aimed at ensuring appropriate dewatering from the tunnel.

Previous Next

Geological summary: Metamorphic terrains of Archean age (biotite plagiogneiss, biotite schist and amphibolite) covered by a (meta)sedimentary complex mainly composed of limestones, dolomites and marlites